HOMEABOUTSERVICESMARKETSEXPERIENCELINKSCONTACT US

 

 

 

 

Text Box: NEW FACILITY / EXPANSION / CONSOLIDATION
Owens Illinois (OI) – 
Storing & Shipping Inventory Bar Code System Implementation
 
$8,000,000
18 Plants Nationwide
 
Pilkington North America – 
New Product Launch Schedule Management System
 
$150,000
Toledo, OH
 
Kelsey-Hayes (TRW) – 
Relocate 8 Automotive Component Assembly Lines
 
$6,000,000
Brighton, MI – Auburn, IN
 
Owens Illinois (OI) – 
Biometric Time & Attendance System Implementation
 
$2,000,000
18 Plants Nationwide
 
Kelsey-Hayes (TRW) – 
Relocate Door Lock Actuator Assembly Lines 
 
$8,000,000
Brighton, MI to Boston, MA
 
NEW & RELOCATED PROCESS LINES
Crown Cork & Seal – 
New 36” Coil Coating Process Line
 
$2,000,000
Toledo, OH
 
First Solar – 
Evaluation for New ERP System
 
$50,000
Perrysburg, OH
 
Rhetech – 
Plastic Plant Extrusion Process & Material Handling Systems 
 
$400,000
Whitmore Lake, MI
 
Lafarge Lime - 
Evaluation of Indirect Fired Lime Kiln Burner Concept
 
$250,000
Millersville, OH
 
Libbey Owens Ford (LOF - Pilkington) – 
Design Electrical Substation No. 5 for float glass plant 
 
$250,000 
Rossford, OH
 
Rhetech – 
Plastic Plant Truck & Rail Bulk Material Handling & Silo Storage Expansion
 
$200,000
Whitmore Lake, MI
 
Kelsey-Hayes (TRW) – 
Layout & Installation of New Automated Truck Rotor Assembly Lines
 
$8,000,000
Fayette, OH
 
Seneca Wire – 
Wire Processing Line, Cooling & Dust Handling Systems
 
$250,000
Fostoria, OH
 
Lafarge – 
Limestone Quarry Modular Crusher Structure Design
 
$750,000
Marblehead, OH
 
PROCESS IMPROVEMENTS
Pilkington – 
Window Quality Check Fixtures Evaluation 
 
$50.000
Niles, MI
 
Contractors & Industrial Supply, Inc. – 
Design of Below-the-Hook Graphite Electrode Lifting Devices 
 
$100,000
Nashville, TN
 
Harris Semiconductor – 
Silicon Wafer FAB Area and Cleanroom Construction 
 
$450,000
Findlay, OH
 
Contractors & Industrial Supply, Inc.
Design of Off-line Graphic Electrode Assembly for Electric Arc Furnaces
 
$120,000
Nashville, TN
 
Crown Cork & Seal – 
60" Coil Coating Line Rewind Upgrade
 
$180,000 
Toledo, OH
 
National Lime & Stone – 
Limestone Quarry Slurry System Piping River Bridge
 
$130,000
Lima, OH
 
Harris Semiconductor – 
Rooftop Unitary Air Handler Replacements
 
$300,000
Findlay, OH
 
Doehler Jarvis – 
Aluminum Casting Facility Modifications
 
$150,000
Toledo, OH
 
Seneca Wire – 
Wire Processing Line Improvements
 
$145,000
Fostoria, OH
 
National Lime & Stone – 
Limestone Quarry Sizing Storage Bin Reconstruction
 
$120,000
Cary, OH
 
North Star BHP Steel – 
Redesigned Lid for 300-Ton Ladle
 
$150,000
Delta, OH
 
Harris Semiconductor – 
Chiller System & Facility Distribution Modifications
 
$200,000
Findlay, OH
 
Redland Ohio (Lafarge) – 
Limestone Quarry Material Handling Modifications
 
$125,000
Woodville, OH
 
SAFETY IMPLEMENTATION
Ferro Corporation – 
Structural Evaluation of Storage Silos & Platform Loadings 
 
$20,000
Stryker, OH
 
North Star BHP Steel – 
Water Tower Evaluation
 
$10,000
Delta, OH
 
Crown Cork & Seal – 
36" and 60" Coil Processing Line Safety Guarding
 
$30,000
Toledo, OH
 
Seneca Wire – 
Structural Evaluations and Forensic Engineering Investigations
 
$8,000
Fostoria, OH
 
North Star BHP Steel – 
Furnace & Caster Area Mezzanine Load Ratings
 
$25,000
Delta, OH
 
Norplas / Magna – 
Design of Safety Support for 25-Ton Injection Mold 
 
$50,000
Perrysburg, OH
 
North Star BHP Steel – 
Caster Tundish Car & Caster Preheat Arm Safety Supports & Platforms
 
$60,000
Delta, OH
 
Simplex Grinnell / Tyco – 
Fire Alarm Systems Review for New Jeep Assembly Plant
 
$150,000
Toledo, OH
 

 

 

 

 

 

Text Box: Projects - Industrial Manufacturing

 

 

 

 

 

 

 

 

Site Map - Legal Terms - Privacy Terms - Contact Us   

Copyright 2008 - Benchmark Engineering Group, Inc.

All Rights Reserved

Back